References - Infrastructure
Planning and Implementation Unattended Automated Metro System in Nuremberg
Services rendered:
- Working out functional performance specifications for a call to tender for an automatic unattended metro system (rolling stock and track equipment) in Nuremberg, including the conversion of existing conventional route sections
- Development of a concept for operational / organizational and technical fire protection for unattended train operation and combined operation (unattended / driver-conducted) taking into consideration avoidance, detection, monitoring and fighting of fire
- Development of specifications for the unattended train operation UTO in the Nuremberg metro network (rolling stock and track equipment)
- Development of operations procedures for the unattended train operation UTO. The relevant operational processes are identified and formulated, taking into consideration the statutary laws and relevant regulations
- Technical work on planning and test support for the intrusion detection systems on the platform tracks. As the Nuremberg system does not use platform doors, detection of people in the platform tracks is a critical issue. The intrusion detection system has especially been developed for this purpose.
Client:
VAG Verkehrs-Aktiengesellschaft Nürnberg
(Nuremberg Transit Authority)
Südliche Fürther Str. 5
90338 Nürnberg
Germany
Handling period:
2000 bis 2007
Data Rubin Project:
Phase 1: Erection of Line U3
Approx. 5.7 km, 9 stations
Officially in operation since June 2008
Phase 2: Migration of Line U2
to automatic operation
Approx. 13 km (already existing in conventional operation) Migration to unattended automatic train operation UTO until end of 2009
Processing:
Jointly with VAG Nürnberg